ALL IN STOCK WELDING TABLES & ACCESSORIES SHIP OUT IN JUST 1 TO 3 BUSINESS DAYS
Application scenarios of D28 welding platform
Jul 17,2025

Heavy equipment manufacturing
Case: After adopting the D28 platform, a wind turbine tower production enterprise reduced the preparation time for single tower welding fixtures from 12 hours to 1.5 hours, saving an annual tooling cost of 2 million yuan.
Advantages: The platform has strong load-bearing capacity, can simultaneously fix multiple segmented workpieces, and supports parallel operations at multiple workstations.
Ship segmented welding
Case: A shipyard utilized the 3D positioning capability of the D28 platform to achieve seamless assembly of ship surface segments, reducing welding deformation by 60%.
Advantages: The combination of hole grid and angle sensor can accurately adjust the spatial posture of the workpiece, ensuring a docking accuracy of ≤ 0.5mm.
Assembly of Rail Transit Vehicles
Case: A subway car manufacturer integrated the D28 platform with a robot welding system to achieve automated welding of the side walls of the car body, increasing the production cycle time to 45 minutes per section.
Advantages: The platform is linked with the positioner and slide rail to form a flexible production line, supporting mixed production of multiple vehicle models.
Hot Tags:
Contact Us
E-mail:
Phone/WhatsApp:
Address:
Jiaohe Town, Botou City, Cangzhou City, Hebei Province, China
Related Posts